    Supercritical Water Environment Corrosion Testing System

    image

    Scale:lMax working temperature: 650℃lMax working pressure: 30MPalTest cell capacity: 2.5LlMax flow rate: 15L/hFunction:lLong term corrosion testlCP release behavior testlStress corrosion cracking testlElectrochemistry testAchievements:Screening and qualification tests on cladding materials for SCWR

    View Detail

  • 1970-01-01

    AC600 Secondary-side Passive Residual Heat Removal System (PRHRS) Test Facility

    image

    Scale:lPower: 500MW, Scaling factor: 1/390lDesign Pressure: 8.6MPa, Design Temperature: 316℃lAir-cooler funnel height: 12.8mFunction:lChinese Advanced PWRs Secondary-side PRHRS comprehensive experimentsAchievements:lAC600 Secondary-side PRHRS experimentslChinese Advanced PWRs PRHRS comprehensive experiments

    View Detail

  • 1970-01-01

    Control Rod Drive Line Cold Test Facility

    image

    Scale:lOperation pressure: ≤1MPa, operation temperature: ≤80℃lFlow rate in loop: 700m3/h, pressure head of pump: 65m H2OFunction:lFor cold test on hydraulic property of reactor control rod drive line, test on hydraulic characteristics of fuel assembly, special valve and other reactor componentsAchievements:lCold test on centering of reactor control rod drive line of Qinshan Phase-II  600MWe NPPlCold test on hydraulic property of reactor control rod drive line of nuclear power devicelTest research on hydraulic characteristics of fuel assembly of nuclear power devicelTest research on hydraulic characteristics of steam generator of nuclear power device

    View Detail

  • 1970-01-01

    Freon Test Facility

    image

    Scale:lPower: 500MWlPressure: üDesign Pressure: 4.0MPa üOperation Pressure: 2.77MPalTemperature: üDesign Temperature: 120℃ üOperation Temperature: 89℃lFlow rate: üMain Pump Flow Rate: 60t/h  üTest Section Flow Rate: 25t/hFunction:lResearch on two-phase flow and boiling heat transfer mechanismAchievements:lRod bundle CHF fluid modeling experimentslSub-cooled boiling visual experiments in narrow channel

    View Detail

  • 1970-01-01

    Multi-Point Actuating Seismic Test Facility

    image

    Scale:lFour actuators with Max. output force: 63KNlFrequency range of hydraulic system: 0.1~100HzlMaximum displacement of the actuator: ±125mmlDepth of the pit:15m with 12m undergroundFunction:lUsed for seismic test research of slim and flexible structures in reactor field and test research of multi-point actuating.Achievements:lReactor control rod drive line seismic test of 600MWe nuclear power plant of Qinshan phase II NPP

    View Detail

  • 1970-01-01

    Power Equipment Integrated Test Facility

    image

    Scale:lPower: 450kWlLarge circulation loop Parameters: ü Design pressure: 17.2MPa ü Design temperature: 350℃ üFlow rate: 780/390 m3./h üPump head: 85/21mH2OlSmall circulation loop: üDesign pressure: 19.6MPa üDesign temperature: 350℃ üFlow rate:100m3./h üPump head: 88mFunction:NPP control rod drive line thermal state performance test research, NPP reactor coolant pump and special valve thermal state performance test research.Achieve...

    View Detail

  • 1970-01-01

    6m×6m Seismic Simulation Test Table

    image

    Scale:lTable size: 6m×6m, Max. payload: 600KNlMax. displacement: üHorizontal direction: ±150mm, üVertical direction: ±100mmlMax. acceleration: üWith full loading, Horizontal direction 1g,Vertical direction 0.8g; üWithout loading, Horizontal direction 3g,Vertical direction 2.6glFrequency range: 0.1~80HzlDegrees of freedom:6 with 3 of translation and 3 of rotationFunction:lSeismic qualification test and research of structures ...